Dam Stabilization – Caldwell, OH

Caldwell Lake Dam
34,000 CYs Rockfill
Concrete Riser
Water Intake Tower Repair

Rock Excavation – Hockingport, OH

Alan Stone was contracted by ODOT for an excavation project in Hockingport, Ohio. The project required 170,000 cubic yards of rock excavation and 212 drilled caisson for retaining wall.